FixVault

Separation Work

  1. Change engine slinger installing to cylinder head (right bank).
    Fig 1: Locating Engine Slingers
    G00726527Courtesy of NISSAN MOTOR CO., U.S.A.
    NOTE: In order to keep secure position when hoisting engine.

    Slinger bolts: 

    1. 33.4 N.m (3.4 kg-m, 25 ft-lb) 

  2. Remove engine mounting insulators (RH and LH) under side nut with power tool.
  3. Lift with hoist and separate engine and transmission assembly from front suspension member.
    CAUTION:
    • Before and during this lifting, always check if any harnesses are left connected.
    • Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
  4. Remove alternator. Refer to GENERATOR .
  5. Remove starter motor. Refer to REMOVAL & INSTALLATION .
  6. Separate engine from transmission assembly. Refer to REMOVAL AND INSTALLATION (AWD MODELS) .
  7. Remove front final drive from engine. Refer to FRONT FINAL DRIVE ASSEMBLY .
  8. Remove engine mounting insulators (RH and LH) and brackets (RH and LH) from engine with power tool.
  9. Remove engine rear member and engine mounting insulator (rear) from transmission.