FixVault

A/T PV IGN Relay

  1. Apply 12V direct current between A/T PV IGN relay terminals 1 and 2.
  2. Check continuity between relay terminals 3 and 5.
    Fig 1: Checking Continuity A/T PV IGN Relay (1 Of 2)
    G02021382Courtesy of NISSAN MOTOR CO., U.S.A.
    Fig 2: Checking Continuity A/T PV IGN Relay (2 Of 2)
    G02021383Courtesy of NISSAN MOTOR CO., U.S.A.
  3. If NG, replace A/T PV IGN relay.