Transfer Motor: Installation
- Apply petroleum jelly or ATF to O-ring.
- Align width across flat-notch with oil pump groove, and install transfer motor.
- Tighten bolts.
Tightening Torque: 41 - 48 N.m (4.2 - 4.9 kg.m, 30 - 35 ft.lb)
- Install breather pipe to transfer motor.
- Connect transfer motor harness connector.