FixVault

ASCD Pump

  1. Disconnect vacuum hose from ASCD pump and ASCD pump harness connector.
  2. If necessary remove ASCD pump.
  3. Connect vacuum gauge to ASCD pump.
  4. Apply 12V direct current to ASCD pump and check operation.
Fig 1: ASCD Pump Components Operation Chart
G00738721Courtesy of NISSAN MOTOR CO., U.S.A.
Fig 2: Checking ASCD Pump Operation
G00738722Courtesy of NISSAN MOTOR CO., U.S.A.

A vacuum pressure of at least -40 kPa (- 0.41 kg/cm 2 , -5.8 psi) should be generated  .