FixVault

With CONSULT-II

  1. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT-II.
    Fig 1: Scan Tool Display - Active Test
    G00796652Courtesy of NISSAN MOTOR CO., U.S.A.
  2. Make sure that each circuit produces a momentary engine speed drop.

OK or NG 

  1. OK: INSPECTION END 
  2. NG: GO TO 11. CHECK CONDENSER CIRCUIT FOR OPEN AND SHORT .