FixVault

Ignition Signal Check for Display Control Unit

  1. CHECK IGNITION SIGNAL 
    1. Turn ignition switch ON.
    2. Check voltage between display control unit harness connector M75 terminal 12 (G/R) and ground.
      1. Battery voltage should exist. 

    OK or NG 

    1. OK : Replace display control unit.
    2. NG : Check harness for open or short between display control unit and fuse.
    Fig 1: Checking Voltage Between Display Control Unit Harness Connector M75 Terminal 12 (G/R) And Ground
    G02365673Courtesy of NISSAN MOTOR CO., U.S.A.