FixVault

Throttle Control Motor Relay

  1. Apply 12V direct current between relay terminals 1 and 2.
  2. Check continuity between relay terminals 3 and 5.
    CONTINUITY SPECIFICATION

    Conditions Continuity
    12V direct current supply between terminals 1 and 2 Yes
    No current supply No
  3. If NG, replace throttle control motor relay.
Fig 1: Checking Continuity Between Relay Terminals 3 And 5
G02369607Courtesy of NISSAN MOTOR CO., U.S.A.