FixVault

Operation Procedure

  1. Perform "CONSULT-II Starting Procedure". Refer to "CONSULT-II START PROCEDURE ".
  2. Touch "ACTIVE TEST".
  3. The test item selection screen is displayed.
  4. Touch necessary test item.
    Fig 1: CONSULT-II Display - Select Test Item
    G04076698Courtesy of NISSAN MOTOR CO., U.S.A.
  5. With the "MAIN SIGNALS" display shown in reverse, touch "START".
  6. The "ACTIVE TEST" screen will be displayed, so perform the following test.