Inspection Procedure
- CHECK SELF-DIAGNOSIS RESULTS
With CONSULT-II
- Turn ignition switch "ON". (Do not start engine.)
- Select "SELF-DIAG RESULTS" mode for "VDC" with CONSULT-II.
- Touch "ERASE".
- Turn ignition switch "OFF" and wait at least 10 seconds.
- Check the self-diagnostic results.SELF-DIAGNOSTIC RESULTS
Self-diagnosis results MAIN RELAY
Is above displayed in the self-diagnosis display?
- YES : GO TO 2.
- NO : INSPECTION END
- CHECK CONNECTOR
- Turn ignition switch "OFF".
- Disconnect VDC/TCS/ABS control unit connector E218 and VDC relay box connector E57. Then reconnect it securely.
- Perform VDC/TCS/ABS control unit self-diagnosis again.
Do any self-diagnosis items appear?
- YES : GO TO 3.
- NO : Poor connection. Repair or replace applicable connector.
- CHECK ACTUATOR RELAY POWER SYSTEM
- Turn ignition switch "OFF".
- Disconnect VDC relay box connector E57.
- Check voltage between VDC relay box harness connector E57 and ground.
9 - Ground : Battery voltage
OK or NG
- OK : GO TO 4.
- NG:
- Check fuse 30A.
- Check continuity between battery and VDC relay box harness connector E57 terminal 9. If it is not OK, replace fuse or harness.
- CHECK ACTUATOR RELAY POWER CIRCUIT
- Turn ignition switch "OFF".
- Disconnect VDC/TCS/ABS control unit connector and VDC relay box connector E56.
- Check continuity between VDC/TCS/ABS control unit harness connector E218 and VDC relay box harness connector E56.
2 - 5 : Continuity should exist.
36 - 7 : Continuity should exist.
OK or NG
- OK : GO TO 5.
- NG : Open or short in harness between VDC/TCS/ABS control unit and VDC relay box.
- CHECK ACTUATOR RELAY UNIT
Check solenoid valve relay as a unit. Refer to "VDC RELAY BOX ".
OK or NG
- OK : Check VDC/TCS/ABS control unit power circuit.
- NG : Replace solenoid valve relay.