FixVault

Operation Procedure

  1. Connect the CONSULT-II and CONSULT-II CONVERTER to the data link connector and start the engine.
    CAUTION: If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on control unit which carries out CAN communication.
  2. Touch "START (NISSAN BASED VHCL)" on the display screen.
  3. Touch "ABS".

    If "ABS" is not indicated, go to "CONSULT-II DATA LINK CONNECTOR (DLC) CIRCUIT ".

  4. Touch "ACTIVE TEST".
  5. The SELECT TEST ITEM screen is displayed.
  6. Touch necessary test item.
    Fig 1: Displaying CONSULT II - SELECT TEST ITEM
    G04134760Courtesy of NISSAN MOTOR CO., U.S.A.
  7. With the "MAIN SIGNALS" display selected, touch "START".
  8. The Active Test screen will be displayed, so conduct the following test.