Assembly (2)
WARNING: This page is about a different car, the 2008 Nissan Titan. However, it is still accessible from the selected car via links, so may be relevant.
- Install O-ring to oil pump assembly.CAUTION:
- Do not reuse O-ring.
- Apply ATF to O-ring.
- Install bearing race to oil pump assembly.CAUTION: Apply petroleum jelly to bearing race.
- Install oil pump assembly in transmission case.CAUTION: Apply ATF to oil pump bearing.
- Apply recommended sealant (Genuine RTV Silicone Sealant or equivalent. Refer to
"RECOMMENDED CHEMICAL PRODUCTS AND SEALANTS
".) to oil pump assembly as shown.CAUTION: Completely remove all moisture, oil, old sealant and any foreign material from the oil pump bolts and oil pump bolt mating surfaces.
- Tighten oil pump bolts to specified torque.
Oil pump bolts : 48 N.m (4.9 kg-m, 35 ft-lb)
CAUTION: Apply ATF to oil pump bushing. - Install O-ring to input clutch assembly.CAUTION:
- Do not reuse O-ring.
- Apply ATF to O-ring.
- Install converter housing to transmission case and tighten bolts to specified torque.
Converter housing bolt : 52 N.m (5.3 kg-m, 38 ft-lb)
Self-sealing bolt (A) : 61 N.m (6.2 kg-m, 45 ft-lb)
CAUTION: Do not reuse self-sealing bolt (A). - Make sure that brake band does not close turbine revolution sensor hole.
- Install control valve with TCM.
- Connect TCM connector and park/neutral position switch connector.
- Install A/T assembly harness connector to control valve with TCM.
- Connect TCM connectors.
- Install O-ring to A/T assembly harness connector.CAUTION:
- Do not reuse O-ring.
- Apply ATF to O-ring.
- Install A/T fluid temperature sensor 2 to bracket.
- Install A/T fluid temperature sensor 2 (with bracket) to control valve with TCM and tighten bolt to specified torque.
Bracket bolt : 7.9 N.m (0.81 kg-m, 70 in-lb)
CAUTION: Adjust bolt hole of bracket to bolt hole of control valve. - Install control valve with TCM in transmission case.CAUTION:
- Make sure that turbine revolution sensor is securely installed into turbine revolution sensor hole.
- Hang down revolution sensor harness toward outside so as not to disturb installation of control valve with TCM.
- Adjust A/T assembly harness connector of control valve with TCM to terminal hole of transmission case.
- Assemble it so that manual valve cutout is engaged with manual plate projection.
- Install bolts (A), (B) and (C) to control valve with TCM.
- → : Front
BOLT SYMBOL CHARTBolt symbol Length mm (in) Number of bolts A 42 (1.65) 5 B 55 (2.17) 6 C 40 (1.57) 1 - Tighten bolt (A), (B) and (C) temporarily to prevent dislocation. After that tighten them in order (A → B → C), and then tighten other bolts.
Bolts : 7.9 N.m (0.81 kg-m, 70 in-lb)
- Connect A/T fluid temperature sensor 2 connector (A).
- Securely fasten terminal cord assembly and A/T fluid temperature sensor 2 harness with terminal clips.
- Connect revolution sensor connector.
- Securely fasten revolution sensor harness with terminal clip.
- Pull down A/T assembly harness connector.CAUTION: Do not damage connector.
- Install snap ring to A/T assembly harness connector.
- Install magnets in oil pan.
- Install oil pan to transmission case. Refer to , "OIL PAN ".
- Install torque converter.
- Pour ATF into torque converter.NOTE:
- Approximately 2 liters (2-1/8 US qt. 1-3/4 lmp qt) of fluid is required for a new torque converter.
- When reusing old torque converter, add the same amount of fluid as was drained.
- Install torque converter while aligning notches of torque converter with notches of oil pump.CAUTION: Install torque converter while rotating it.
- Measure distance "A" to make sure that torque converter is in proper position.
Distance "A" : 24.0 mm (0.94 in) or more