FixVault

Overall Function Check

Use this procedure to check the overall function of the park/neutral position (PNP) signal circuit. During this check, a 1st trip DTC might not be confirmed.

WITH GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP signal) and ground under the following conditions.
    VOLTAGE REFERENCE CHART

    Condition (Gear position) Voltage (Known-good data)
    P or N position Approx. 0
    Except the above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSIS PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Signal) And Ground
    G06315713Courtesy of NISSAN MOTOR CO., U.S.A.