Diagnosis Procedure
- CHECK VIAS CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Vehicle Front
- Disconnect VIAS control solenoid (1) valve harness connector.
- Turn ignition switch ON.
- Check voltage between terminal 1 and ground with CONSULT-III or tester.
Voltage: Battery voltage
OK or NG
OK: GO TO 3.
NG: GO TO 2.
- Turn ignition switch OFF.
- DETECT MALFUNCTIONING PART
Check the following.
- Harness connectors E12, F3
- Harness for open or short between VIAS control solenoid valve and IPDM E/R
Repair or replace harness or connectors.
- CHECK VIAS CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
- Turn ignition switch OFF.
- Disconnect ECM harness connector.
- Check harness continuity between ECM terminal 29 and VIAS control solenoid valve terminal 2.
Refer to SYSTEM WIRING DIAGRAMS article.
Continuity should exist .
- Also check harness for short to ground and short to power.
OK or NG
OK: GO TO 4.
NG: Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK VIAS CONTROL SOLENOID VALVE
Refer to "COMPONENT INSPECTION ".
OK or NG
OK: GO TO 5.
NG: Replace VIAS control solenoid valve.
- CHECK INTERMITTENT INCIDENT
Refer to "DIAGNOSIS PROCEDURE ".
INSPECTION END