FixVault

Work Procedure

  1. LASER BEAM AIMING ADJUSTMENT

    Adjust the laser beam aiming. Refer to "DESCRIPTION ".

    GO TO 2.

  2. ICC SYSTEM ACTION TEST
    1. Perform the ICC system action test. Refer to "DESCRIPTION ".
    2. Check that the ICC system operates normally.

      INSPECTION END