FixVault

Work Procedure

  1. RADAR ALIGNMENT 

    Perform the radar alignment. Refer to Application Notice .

    GO TO 2.

  2. DCA SYSTEM ACTION TEST 
    1. Perform the DCA system action test. Refer to Description .
    2. Check that the DCA system operates normally.

    INSPECTION END