FixVault
Home
›
Isuzu
›
1989
›
Pickup 1 Ton, MSG5E
›
Repair and Diagnosis
›
Engine Performance
›
Remove, Overhaul & Install
›
Remove/Install/Overhaul
Remove, Overhaul & Install: Remove/Install/Overhaul
Expand All (for easy ctrl-f)
Collapse All
Introduction
Carburetor
Removal & Installation
Overhaul (Amigo & Pickup)
Notes
Major Component Disassembly
Choke Chamber & Float Chamber Assembly
Throttle Chamber Assembly
Major Component Reassembly
Adjustments (Amigo & Pickup)
Notes
Float Level Adjustment
Fast Idle Opening Angle
Primary Throttle Valve and Secondary Throttle Valve Interlock
Choke Valve Opening
Choke Unloader
Distributor Overhaul
Removal & Installation (All Models)
Overhaul
Fuel Rails (PFI)
Removal & Installation (Fuel Rails)
Removal & Installation (PFI Throttle Body)
Oxygen Sensor
Removal & Installation
Throttle Position Sensor/Switch
Notes
Removal & Installation