Test No. 1 - ECM Power Supply: Confirmation
- Disconnect ECM unit harnesses at connectors.
- Turn key switch to ON position.
- Check that power voltage is present at connector terminals No. 33, 12 or 21.
- Check that continuity exists between the connector terminals No. 11, 20 and ground.