FixVault

Operating Procedure: Notes

The power up screen is displayed when you power up the tester with the Isuzu systems PCMCIA card.

Follow the operating procedure below.

Fig 1: Identifying Tech -2 Operating Procedure Display (1 Of 2)
G02715452Courtesy of ISUZU MOTOR CO.
Fig 2: Identifying Tech -2 Operating Procedure Display (2 Of 2)
G02715453Courtesy of ISUZU MOTOR CO.