FixVault

Operating Procedure

The power up screen is displayed when you power up the tester with the Isuzu systems PCMCIA card.

Follow the operating procedure below.

Fig 1: Tech-2 Operating Procedures (1 Of 2)
G02791108Courtesy of ISUZU MOTOR CO.
Fig 2: Tech-2 Operating Procedures (2 Of 2)
G02791109Courtesy of ISUZU MOTOR CO.