FixVault

Engine Hood: Installation

To install, follow the removal steps in the reverse order, noting the following points:

  1. Tighten the engine hood hinge fixing bolts to the specified torque.

    Torque:  10 N.m (87 lb in)

  2. Check the engine hood and fender (1).

    Clearance:  4.5 mm (0.18 in)

    Height (step):  Flush

    • Adjust clearance with the hinges on the engine hood.
    • Adjust height (step) with the hood rests (2).
    Fig 1: Checking Engine Hood & Fender
    G02788110Courtesy of ISUZU MOTOR CO.
Fig 2: Adjusting Clearance With Hinges On Engine Hood
G02788111Courtesy of ISUZU MOTOR CO.
Fig 3: Adjusting Height (Step) With Hood Rests
G02788112Courtesy of ISUZU MOTOR CO.