FixVault

Front Fender Panel: Installation

To install, follow the removal steps in the reverse order, noting the following points:

  1. Tighten the front fender panel fixing bolts to the specified torque. Torque:  7 N.m (61 lb in)
  2. Check the fender and front door (1).

    Clearance:  5.0 mm (0.196 in)

    Height (step)  : Flush

    Fig 1: Identifying Space Between Front Fender & Front Door
    G02795808Courtesy of ISUZU MOTOR CO.
    Fig 2: Checking Clearance Between Fender & Front Door
    G02795809Courtesy of ISUZU MOTOR CO.