Oil Pump - In-Vehicle Procedures: Installation
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2006 Jaguar XKR, 2006 Jaguar XK8, 2005 Jaguar XKR, 2005 Jaguar XK8, and 2004 Jaguar XKR. However, it is still accessible from the selected car via links, so may be relevant.
All vehicles
- Install the oil pump.
- Install the crankshaft sprocket.
- Install the timing chain tensioning tool 303-532 to the exhaust camshaft sprocket.
- Reposition the camshaft sprockets for the most advantageous position for use of the tool.
- Install the primary timing chain tensioner guide.
- Install the primary timing chain.
- Install the primary chain over the crankshaft sprocket and the intake sprocket.
- Install the primary timing chain tensioner guide.
- Tighten to 12 Nm.
- Using a suitable tool, hold the left-hand timing chain tensioner ratchet lock mechanism away from the ratchet stem.
- Install the primary timing chain tensioner assembly.
- Tighten to 12 Nm.
- Using the special tool apply force to the tool in an anti-clockwise direction to tension the primary timing chain on its drive side.
- Tighten to 120 Nm.
- Using the special tool apply force to the tool in an anti-clockwise direction.
- Tighten to 120 Nm.
- Install the primary timing chain guide.
- Tighten to 12 Nm.
- Install the primary timing chain.
- Install the primary chain over the crankshaft sprocket and the intake sprocket.
- Install the primary timing chain tensioner guide.
- Tighten to 12 Nm.
- Using a suitable tool, hold the right-hand timing chain tensioner ratchet lock mechanism away from the ratchet stem.
- Install the primary timing chain tensioner assembly.
- Tighten to 12 Nm.
- Using the special tool apply force to the tool in an anti-clockwise direction to tension the primary timing chain on its drive side.
- Tighten to 120 Nm.
- Using the special tool apply force to the tool in an anti-clockwise direction.
- Tighten to 120 Nm.
- Release the tension in the left-hand timing chain tensioner.
- Remove the retaining tool.
- Release the tension in the right-hand timing chain tensioner.
- Remove the retaining tool.
- Remove the special tool from the right-hand cylinder head.
- Remove the special tool from the left-hand cylinder head.
- Install the left-hand variable camshaft timing oil control unit housing.
- Install the right-hand variable camshaft timing oil control unit housing.
- Remove the special tool.
- Install the crankshaft position sensor.
- Connect the crankshaft position sensor electrical connector.
- Install the oil strainer.
- Install the oil pan. Refer to Oil Pan - In-Vehicle Procedures .
- Install the spark plugs.
- Install the engine front cover. Refer to Engine Front Cover - In-Vehicle Procedures .
CAUTION:
Make sure the timing chain slack is on the tensioned side of the timing chain.
CAUTION:
During timing chain tensioner compression, do not release the ratchet stem until the timing chain tensioner piston is fully bottomed in its bore or damage to the ratchet stem will result.
NOTE:
The retaining tool must remain in the timing chain tensioner until the timing chain tensioner is installed to the engine with the piston bottomed in the bore.
CAUTION:
While applying the opposing force to sprocket and chain, tighten the sprocket bolt.
CAUTION:
While applying the opposing force to sprocket and chain, tighten the sprocket bolt.
CAUTION:
Make sure the timing chain slack is on the tensioned side of the timing chain.
CAUTION:
During timing chain tensioner compression, do not release the ratchet stem until the timing chain tensioner piston is fully bottomed in its bore or damage to the ratchet stem will result.
NOTE:
The retaining tool must remain in the timing chain tensioner until the timing chain tensioner is installed to the engine with the piston bottomed in the bore.
CAUTION:
While applying the opposing force to sprocket and chain, tighten the sprocket bolt.
CAUTION:
While applying the opposing force to sprocket and chain, tighten the sprocket bolt.
Vehicles without supercharger
All vehicles