FixVault

Front Control Module: Installation

Fig 1: FRONT CONTROL MODULE
GC0026395Courtesy of DAIMLERCHRYSLER CORP.
1 - GENERATOR
2 - FCM
  1. Connect the wiring harness to the FCM (2) and hand tighten fasteners. See Fig 1.
  2. Tighten FCM fasteners to 10.8 N.m (96 in. lbs.).
  3. Install the charge air inlet hose.
  4. Connect the negative battery cable.