FixVault

Integrated Control Unit - LHD - Diesel Engine

NOTE: Before installation, be sure the mounting pins are installed in the ICU block, but do not install the mounting bracket.
Fig 1: ICU REMOVAL/INSTALLATION - DIESEL
GC0053103Courtesy of CHRYSLER LLC
  1. Install the ICU (1) into the engine compartment over the top of the engine cylinder head cover (2) as shown in illustration.
    Fig 2: ICU BRACKET MOUNTING - DIESEL
    GC0053102Courtesy of CHRYSLER LLC
  2. Rotate the ICU (1) around behind the engine until the mounting bracket (2) can be installed.
  3. Install the mounting bracket (2) onto the ICU (1). Push the bracket mounting grommets onto the mounting pins of the ICU. Install the single mounting bolt (3). Tighten the mounting bolt to 11 N.m (97 in. lbs.).
    Fig 3: ICU MOUNTING
    GC0053101Courtesy of CHRYSLER LLC
  4. Place mounting bracket for the ICU (1) over the mounting screws (2) and hang the assembly in place.
    Fig 4: Anti-Lock Brake Module Wiring Harness Connector
    GC0000017Courtesy of CHRYSLER LLC
    1 - ABM (PART OF ICU)
    2 - WIRING HARNESS CONNECTOR
    CAUTION: Before installing the ABM harness connector on the ABM, be sure the seal is properly installed in the connector.
  5. Insert the ABM wiring harness connector (2) into the socket of the ABM (1) and close the cover, locking the connector in place.
    Fig 5: BRAKE TUBES AT ICU - MK25E
    GC0039491Courtesy of CHRYSLER LLC
  6. Install the four chassis brake tubes (2, 3, 5, 6) brake tubes at the ICU hydraulic control unit (7). Tighten the tube nuts to 17 N.m (150 in. lbs.).
  7. Install the primary (4) and secondary (1) brake tubes at the ICU hydraulic control unit (7). Tighten the tube nuts to 17 N.m (150 in. lbs.).
  8. Push the brake tube bundle routing clips (with tubes) onto the studs on the dash panel.
  9. Install the heat shield on the dash panel and tighten the lower and upper mounting nuts.
  10. Install the air inlet tube at the air cleaner and engine cylinder head cover.
  11. Raise and support the vehicle. Refer to STANDARD PROCEDURE .
    Fig 6: ICU MOUNTING
    GC0053101Courtesy of CHRYSLER LLC
  12. Tighten the two mounting screws (2) attaching the ICU (1) mounting bracket to the body. Tighten the mounting screws to 23 N.m (17 ft. lbs.).
  13. Tighten the air inlet tube at the turbocharger.
  14. Lower the vehicle.
    Fig 7: BRAKE PEDAL HOLDING TOOL
    GC0053020Courtesy of CHRYSLER LLC
  15. Remove brake pedal holding tool.
  16. Install the engine appearance cover.
  17. Connect the battery negative cable to the battery post. It is important that this be performed properly. Refer to STANDARD PROCEDURE .
    Fig 8: Bleeding Brakes
    GC0006390Courtesy of CHRYSLER LLC
  18. Hook up the scan tool to initialize the ABM and perform the following:
    • Clear any faults.
    • Fill the master cylinder to the proper fill level and bleed the base and ABS hydraulic systems. Refer to STANDARD PROCEDURE .
    • Perform the ABS VERIFICATION TEST and road test the vehicle.