FixVault

Right Side

  1. Install the upper control arm to the vehicle.
  2. Install the upper control arm front flag bolt. Tighten the nut to 122 N.m (90 ft. lbs.). with full vehicle weight. 
  3. Install the upper control arm rear flag bolt. Tighten the nut to 122 N.m (90 ft. lbs.). with full vehicle weight. 
  4. Install the air box.
  5. Install the upper ball joint nut. Tighten the nut to 41 N.m (30 ft. lbs.) plus an additional 90° turn.
  6. Install the right side tire and wheel assembly. Refer to Tires and Wheels/Wheels - Standard Procedure .
  7. Lower the vehicle.
  8. Set the toe. See Front Suspension/Wheel Alignment - Standard Procedure .