FixVault

Rail, Fuel: Installation: 5.7L

CAUTION:

The left and right fuel rails are replaced as an assembly. Do not attempt to separate fuel rail halves at connector tube. Due to design of the connector tube, it does not use any clamps. Never attempt to install a clamping device of any kind to the connector tube. When removing fuel rail assembly for any reason, be careful not to bend or kink the connector tube.

Fig 1: Fuel Injector O-Rings, Fuel Rail/Fuel Injector Assembly & Four Fuel Rail Retaining Bolts
GC0144606Courtesy of CHRYSLER GROUP, LLC
NOTE:

The fuel injector O-rings may be used again, provided no cuts, tears, or deformation have occurred.

  1. If removed, install the fuel injectors onto the fuel rail. Refer to INJECTOR(S), FUEL, INSTALLATION  or INJECTOR(S), FUEL, INSTALLATION .
  2. Inspect the fuel injector O-rings (3) and replace if necessary.
  3. Clean out the fuel injector machined bores in the intake manifold.
  4. Apply a small amount of engine oil to each fuel injector O-ring (3).
    Fig 2: Fuel Rail Mounting Bolts Tightening Sequence
    GC0132256Courtesy of CHRYSLER GROUP, LLC
  5. Position fuel rail/fuel injector assembly (1) into the machined fuel injector bores of the intake manifold.
  6. Guide each injector into the intake manifold using care not to tear the fuel injector O-rings.
  7. Push the right fuel rail down until the fuel injectors have bottomed on shoulders.
  8. Push the left fuel rail down until the injectors have bottomed on shoulders.
  9. Using the sequence shown in illustration, install the four fuel rail retaining bolts (2) and tighten to 11 N.m (8 ft. lbs.).
  10. Connect the fuel line (1) to the fuel rail. Refer to STANDARD PROCEDURE - QUICK-CONNECT FITTINGS  .
  11. Connect the fuel injector electrical connectors.
  12. Connect the PCV hose.
    Fig 3: Intake Air Temperature (IAT) Sensor, Air Cleaner Housing, Resonator Retaining Bolt & Hose Clamp
    GC0144403Courtesy of CHRYSLER GROUP, LLC
  13. Position the resonator onto the throttle body and air cleaner housing.
  14. Tighten the hose clamp at the throttle body (4) to 5 N.m (45 in. lbs.).
  15. Install the resonator retaining bolt (3) and tighten to 5 N.m (45 in. lbs.).
  16. Tighten the hose clamp at the air cleaner housing (2) to 5 N.m (45 in. lbs.).
  17. Connect the electrical connector at the Intake Air Temperature (IAT) sensor (1).
    Fig 4: Oil Fill Cap & Engine Cover
    GC0143807Courtesy of CHRYSLER GROUP, LLC
  18. Install the engine cover (2).
  19. Start the engine and check for leaks.