FixVault

Sensor, Variable Line Pressure: Removal: Removal

Fig 1: Variable Line Pressure Sensor & Pressure Control Solenoid
GC0082079Courtesy of CHRYSLER GROUP, LLC
1 - PRESSURE CONTROL SOLENOID
2 - LINE PRESSURE SENSOR
3 - SHOULDER SCREW
4 - VARIABLE LINE PRESSURE HEADER
5 - MANUAL SHAFT
6 - SCREWS
  1. Remove the valve body from the transmission. Refer to VALVE BODY, REMOVAL .
  2. Remove the electrical connectors from the pressure control solenoid (1) and the line pressure sensor (2). Refer to Fig 1.
  3. Remove the screws (6) holding the pressure control solenoid (1) and line pressure sensor (2) to the valve body.
  4. Remove the pressure control solenoid and line pressure sensor from the valve body.