Module, Power Top Control, Full Open Retractable Roof: Installation: Installation
- Position the module (2) onto the power full open retractable roof assembly.
- Install the two mounting screws (1).
- Connect the electrical connectors (3).
- Install the headliner. Refer to HEADLINER, INSTALLATION .
- Connect the battery negative cable.
- Re-initialize roof assembly. Refer to STANDARD PROCEDURE .