FixVault

Stabilizer Bar, Front: Installation: Switch

Fig 1: OFF ROAD Switch Pod, SWAY BAR Switch & AXLE LOCK Switch
GC0148172Courtesy of CHRYSLER GROUP, LLC
  1. Press the switch pod (1) firmly into the instrument panel opening making sure the retaining tabs seat properly.
    Fig 2: Electrical Connector & Retaining Tabs
    GC0148173Courtesy of CHRYSLER GROUP, LLC
  2. Attach the electrical connector (1).
    Fig 3: End Cap
    GC0131421Courtesy of CHRYSLER GROUP, LLC
  3. Install the instrument panel end cap (1).
  4. Connect the negative battery cable.