FixVault

Module, Power Top Control, Full Open Retractable Roof: Installation: Installation

WARNING: This page is about a different car, the 2012 Jeep Liberty. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Electrical Connectors
GC0086468Courtesy of CHRYSLER GROUP, LLC
  1. Position the module (2) onto the power full open retractable roof assembly.
  2. Install the two mounting screws (1).
  3. Connect the electrical connectors (3).
  4. Install the headliner. Refer to HEADLINER, INSTALLATION .
  5. Connect the battery negative cable.
  6. Re-initialize roof assembly. Refer to STANDARD PROCEDURE .