FixVault

Module, Electronic Shift (ESM): Installation

G00381298Courtesy of CHRYSLER GROUP, LLC
  1. Position the shifter assembly in place and connect the shifter wire harness connector (1).
    G00381297Courtesy of CHRYSLER GROUP, LLC
  2. Install the shifter bolts (1) and tighten to the proper torque specifications.
  3. Install the shifter bezel. Refer to BEZEL, SHIFTER, INSTALLATION .
  4. Connect the negative battery cable.