FixVault

Removal And Installation: Installation

GC0164973Courtesy of CHRYSLER GROUP, LLC
  1. Install the cooling fan (1b) and secure the retaining brackets (1a).
    GC0165167Courtesy of CHRYSLER GROUP, LLC
  2. Attach the cooler lines to the retainer and close the retainer (2b).
  3. Attach the wire harness retainer (1c) to the fan shroud.
  4. Connect the cooling fan wire harness connector (1b).
  5. Connect the resistor wire harness connector (1a).
    GC0165116Courtesy of CHRYSLER GROUP, LLC
  6. Install the pressurized coolant bottle (1b) and secure the tabs (1a).
    GC0164459Courtesy of CHRYSLER GROUP, LLC
  7. Remove the plugs from the transmission cooler and lines.
  8. Connect the transmission oil cooler lines (1b) and the retaining clips (1a).
  9. Install the front fascia. Refer to FASCIA, FRONT, INSTALLATION .
    GC0164856Courtesy of CHRYSLER GROUP, LLC
  10. Install the exhaust heat shield (1c) and securely tighten the fasteners (1a) and (1b).
  11. Install the upstream oxygen sensor. Refer to SENSOR, OXYGEN, INSTALLATION .
  12. Install the engine cover. Refer to COVER, ENGINE, REMOVAL AND INSTALLATION .
  13. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.