FixVault

Pod, Switch: Installation

GC0186793Courtesy of CHRYSLER GROUP, LLC
  1. Position the switch pod to the instrument panel center bezel and make sure the switch pod engages the three tabs (2).
  2. Install and securely tighten the fasteners (1) for the switch pod.
  3. Install the instrument panel center bezel. Refer to BEZEL, INSTRUMENT PANEL, CENTER, INSTALLATION .
  4. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.