FixVault

5.7L / 6.4L

GC0188314Courtesy of CHRYSLER GROUP, LLC
  1. Install the ignition capacitors. Tighten the fasteners (1) to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
  2. Install the ignition capacitor wire harness connectors.
  3. Install the engine cover.
  4. Connect the negative battery cable.