FixVault

Solenoid, Variable Valve Timing: Installation

WARNING: This page is about a different variant/trim than selected.
GC0181478Courtesy of CHRYSLER GROUP, LLC
  1. Install a NEW  gasket (1).
    GC0181764Courtesy of CHRYSLER GROUP, LLC
  2. Install the Variable Valve Timing (VVT) solenoid (1) and tighten the bolts (2) to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
    GC0186994Courtesy of CHRYSLER GROUP, LLC
  3. If removed, install the right isolator to engine mount bracket bolt (2) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS .
    GC0181153Courtesy of CHRYSLER GROUP, LLC
  4. Connect the VVT solenoid wire harness connector (1).
  5. Install the clean air hose and air cleaner body cover. Refer to HOSE, CLEAN AIR .
  6. Install the top engine cover. Refer to COVER, ENGINE, INSTALLATION .
  7. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.