Resistance Inspection
- Disconnect negative battery cable.
- Pull data link connector upward from MAF sensor.
- Disconnect air temperature sensor connector and MAF sensor connector.
- Remove air cleaner assembly.
- Disconnect input/turbine speed sensor connector.
- Measure resistance between terminals 1 and 2.
Resistance: 300-400 ohms
- If not as specified, replace input/turbine speed sensor.
Tightening torque: 69.6-94.8 lb.in (8-11 N.m, 80-110 kg.cm)
- Install air cleaner assembly.
- Connect air temperature sensor connector and MAF sensor connector.
- Install data link connector to MAF sensor.
- Connect negative battery cable.