FixVault

Control Circuit Inspection

  1. IG "OFF".
  2. Disconnect ECM/PCM harness connector.
  3. IG "ON".
  4. Measure the voltage between terminal 53/C01-1 (94/C01) of PCM (ECM) harness connector and ground.

    Specification: B+

  5. Is the measured voltage within specification ?

    YES 

    NO