FixVault

Ground Circuit Inspection

  1. Key "OFF".
  2. Disconnect FTPS harness connector.
  3. Key "ON".
  4. Measure the voltage between terminal 1 of FTPS harness connector and chassis ground (A).
  5. Measure the voltage between terminal 1 and 2 of FTPS harness connector (B).

    Specification: A-B is below 200mV.

    Fig 1: Measuring Voltage Between Terminal 1 Of FTPS Harness Connector And Chassis Ground
    G06130633Courtesy of KIA MOTORS AMERICA, INC.
  6. Is the measured voltage within specification?

    YES 

    NO