Condenser Assembly
- Recover the refrigerant with a recovery/recycling/charging station (Refer to REFRIGERANT LEAK TEST ).
- Disconnect the negative (-) battery terminal.
- Remove the radiator. (Refer to RADIATOR )
- Remove 2 nuts (A), and then disconnect the discharge line and liquid line from the condenser. Plug or cap the lines immediately after disconnecting them to avoid moisture and dust contamination.
TORQUE: 7.8~11.7N.m (0.8~1.2kgf.m, 5.9~8.7lb.ft)
- Remove 2 bolts, and then remove the condenser (A) by lifting it up. Be careful not to damage the radiator and condenser fins when removing the condenser.
- Install in the reverse order of removal, and note these items :
- If you're installing a new condenser, add refrigerant oil ND-OIL8.
- Replace the O-rings with new ones at each fitting, and apply a thin coat of refrigerant oil before installing them. Be sure to use the right O-rings for R-134a to avoid leakage.
- Be careful not to damage the radiator and condenser fins when installing the condenser.
- Be sure to install the lower mount cushions of condenser securely into the holes.
- Charge the system, and test its performance. (Refer to SYSTEM CHARGING )