Repair Procedures: Installation
- Install the intake manifold (A).
Tightening torque :
18.6 ~ 23.5N.m (1.9 ~ 2.4kgf.m,13.7 ~ 17.4lb-ft)
- Install the oil level gauge.
- Install the intake manifold stay (A).
Tightening torque :
18.6 ~ 23.5N.m (1.9 ~ 2.4kgf.m,13.7 ~ 17.4lb-ft)
- Install the PCV hose (A).
- Install the coolant hose (A) to the throttle body.
- Connect the PCSV hose (D), brake booster vacuum hose (C), fuel hose (B) and intake CMP sensor connector (A). Connect the VCM connector (E) (SULEV only).
- Connect the ETC connector (A) and MAP sensor connector (B).
- Connect the injector connectors (A).
- Connect the exhaust OCV connector (A) and replace the wiring from the cylinder head cover.
- Connect the intake OCV connector (A), power steering switch connector (B), VIS connector (C), OPS connector (D), knock sensor connector (E), alternator connector (F) and A/C switch connector (G).
- Install the air cleaner assembly (C) then connect the breather hose (A), ECM connector (B).
Tightening torque :
7.8 ~ 11.8N.m (0.8 ~ 1.2kgf.m, 5.8 ~ 8.7lb-ft)
- Install the engine cover (A).