FixVault

Control Circuit Inspection

  1. IG "OFF".
  2. Disconnect PCM harness connector.
  3. IG "ON".
  4. Measure the voltage between terminal 53/C01-1 (94/C01) of PCM (ECM) harness connector and ground.
    1. Specification : B+
      Fig 1: Measuring Voltage Between Terminal 53/C01-1 Of PCM (ECM) Harness Connector And Ground
      G06831032Courtesy of KIA MOTORS AMERICA, INC.
      Fig 2: Measuring Voltage Between Terminal 94/C01 Of PCM (ECM) Harness Connector And Ground
      G06831033Courtesy of KIA MOTORS AMERICA, INC.
  5. Is the measured voltage within specification?

    YES

    1. Go to "COMPONENT INSPECTION " procedure.

    NO

    1. Check the bulb and repair as necessary.
    2. Repair Open or Short in control circuit and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.