FixVault

Ground Circuit Inspection

  1. Ignition "OFF"
  2. Disconnect Battery (-) terminal.
  3. Refer to " INJECTOR DRIVE BOX (IDB) " and disconnect IDB connector.
  4. Measure resistance between Pin No. 1 (Ground) terminal of IDB harness connector and chassis ground.
  5. Measure resistance between Pin No. 2 (Ground) terminal of IDB harness connector and chassis ground.
  6. Measure resistance between Pin No. 4 (Ground) terminal of IDB harness connector and chassis ground.

    Specification:  Approx. below 1Ω

  7. Is measured value within specification?

    YES 

    NO