FixVault

Repair Procedures: Inspection

  1. Connect the GDS to the Data Link Connector (DLC).
  2. Measure the output voltage of the RPS at idle and various engine speed.
Fig 1: RPS Voltage/Pressure Graph
G10648892Courtesy of KIA MOTORS AMERICA, INC.