FixVault

Signal Circuit Inspection

  1. IG "OFF" and disconnect HO2S (S2) connector.
  2. IG "ON".
  3. Measure voltage between Pin No. 1 (Signal) terminal of HO2S (S2) harness connector and chassis ground.

    Specification:  Approx 0.45V

  4. Is the measured voltage within specification?

    YES 

    NO