FixVault

Control Circuit Inspection

  1. IG "OFF" & Disconnect HO2S (S2) connector.
  2. IG "ON".
  3. Measure voltage between Pin No. 4 (Control) terminal of HO2S (S2) harness connector and chassis ground.

    Specification:  Approx. 3.5V

  4. Is the measured voltage within specification?

    YES 

    NO