FixVault

Signal Circuit Inspection

■ Check voltage 

  1. IG "OFF". Disconnect OTS connector.
  2. IG "ON"
  3. Measure voltage between signal terminal of OTS harness connector and chassis ground.

    Specification:  Approx. 3.3V

  4. Is the measured voltage within specification?

    YES 

    NO 

■ Check open in harness 

  1. IG "OFF". Disconnect OTS connector and PCM connector.
  2. Measure resistance between signal terminal of OTS harness connector and OTS signal terminal of PCM harness connector.

    Specification:  Below 1Ω

  3. Is the measured resistance within specification?

    YES 

    NO