FixVault

PCSV Inspection

■ Perform PCSV Actuation Test 

  1. Connect GDS to Data Link Connector (DLC).
  2. IG KEY "ON" & ENG "OFF".
  3. Perform "Actuation Test" for "Canister Purge Valve".
    Fig 1: Scantool Display - Canister Purge Valve Actuation Test
    G11854856Courtesy of KIA MOTORS AMERICA, INC.

■ Inspect PCSV 

  1. IG Key "OFF".
  2. Disconnect PCS connector.
  3. Measure resistance between Pin No. 2 (Power) terminal and Pin No. 1 (Control) terminal of the PCSV.

    Specification:  Approx. 2.0 kΩ (20°C)

    Fig 2: Scantool Display - Resistance Of PCSV
    G11854857Courtesy of KIA MOTORS AMERICA, INC.

■ Confirm Part Inspection 

  1. Does the PCSV operate properly? (Check Variation)

    YES 

    NO 

    • Carefully redo this troubleshooting guide steps.