FixVault

Signal Circuit Inspection

  1. Ignition "OFF".
  2. Refer to "O2 SENSOR CONNECTOR REMOVAL " and disconnect Downstream O2 Sensor connector.
  3. Ignition "ON".
  4. Measure voltage between Pin No. 1 (Signal) terminal of Downstream O2 Sensor harness connector and chassis ground.

    Specification:  Approx. 0.5 V

  5. Is the measured value within specification?

    YES 

    NO 

    • Repair open or short in signal circuit between Downstream O2 Sensor and PCM and then go to "Verification Of Repair " procedure.