FixVault

Control Circuit Inspection

  1. Ignition "OFF" & Disconnect VFS In - Bank1 connector.
  2. Ignition "ON".
  3. Measure voltage between Pin No. 1 (Control) terminal of VFS In - Bank1 harness connector and chassis ground.

    Specification:  Approx. 2.4V

  4. Ignition "OFF" & Disconnect ECM connector.
  5. Measure resistance between Pin No. 1 (Control) terminal of VFS In - Bank1 harness connector and chassis ground.

    Specification:  ∞ (Infinity)Ω

  6. Is the measured value within specification?

    YES 

    NO