FixVault

Control Circuit Inspection

  1. Ignition "OFF" and disconnect ECM connector.
  2. Measure voltage between Pin No. 21 (Engine control relay control) terminal of ECM harness connector and chassis ground.

    Specification:  Battery voltage

  3. Is the measured voltage within specification?

    YES 

    NO